CASAGRANDE C6
Usage of the Equipment
This machine is essential for any company in the shoring of piling industry as any excavation with a depth of over 4 mtr will have to have anchors drilled into the excavation face to brace the shoring wall at least every 2 meter and in rows in depths for approximately every 3 mtr. So, for example for a 12 mtr deep excavation at least 3 rows of anchors will be required. Therefore, the foundation excavations will get deeper.
Application of the equipment
- Drilling micro piles for deep excavation raft bracing.
- Drilling for soil investigation.
- Drilling for overburden stabilization (soil nails).
- Drilling with continuous flight auger 6.50m for wellpoint installation.
- Jet grouting for soil stabilization.
- Drilling for shallow wells to -15 meter.
- Drilling with flushing system and rock hammer in rocky areas.
Share :